Chain Links for Double Chain Scraper Conveyer in Coal Mine

Product Details
Customization: Available
After-sales Service: Within 20-30 Days After Contract Established
Warranty: 6months

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Portuguese
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (16)
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
  • Chain Links for Double Chain Scraper Conveyer in Coal Mine
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Type
Chain Links
Application
Excavator
Certification
ISO9001: 2000
Condition
New
Selling Units
Single Item
Single Gross Weight
5.000kg
Material
55crsi,60si2mn,60si2mna
Pemanent Stnelches Aften Broken
8
Max Strctches Under Testring Load
2%
Chain Guard Technique
Forging
Video Outgoing-Inspection
Provided
Colors
Black
Surface Hardness
HRC52-58,Deepth:8mm-12mm
Finish
Smooth
Single Package Size
100X50X50cm
Machinery Test Report
Provided
Specification
25 KG
Trademark
DZR
Origin
Fujian, China
Production Capacity
10000pieces/Years

Product Description

chain links for double chain scraper conveyer in coal mine
Chain Links for Double Chain Scraper Conveyer in Coal Mine

Product Description

We focus on manufacturing high-quality mining equipment parts, providing a wide range of high-performance mining chains, round link chains and link links. Whether it is the scraper conveyor used in coal mining or other transmission equipment under complex working conditions, our high-strength chains, flat link links, sawtooth links and spiral tooth links and other products can ensure the stable operation of the equipment with reliable connection performance and wear resistance.
Chain Links for Double Chain Scraper Conveyer in Coal Mine
As an important component of coal mine equipment, these mining connection rings are crafted through strict processes to precisely fit conveyors of different specifications, effectively enhancing the efficiency of coal mining and providing a solid guarantee for your mining operations.

Product Parameters
 
Material
55CrSi,60Si2Mn,60Si2MnA
Finish Smooth
Colors Black or yellow
chain guard Technique Forging
Surface Hardness HRC52-58,deepth:8mm-12mm
Warranty time   2000 hour
Certification ISO9001-2008
FOB Price FOB Xiamen USD 30-300/Piece
MOQ 30piece
Delivery Time Within 20-30 days after contract established
 
Detailed Photos

Chain Links for Double Chain Scraper Conveyer in Coal MineChain Links for Double Chain Scraper Conveyer in Coal Mine

Chain Links for Double Chain Scraper Conveyer in Coal Mine

 

 

 

Chain Links for Double Chain Scraper Conveyer in Coal Mine

 

Chain Links for Double Chain Scraper Conveyer in Coal Mine

Chain Links for Double Chain Scraper Conveyer in Coal Mine

Chain Links for Double Chain Scraper Conveyer in Coal Mine

 

Chain Links for Double Chain Scraper Conveyer in Coal MineQ1. Are you a trade or a manufacure?
A:We are an industry and trade integration business, our factory located on Quanzhou NananDistric.

Q2.How can l be sure the excavator parts will fit my excavator?
A:Give us correct model number/machine serial number/ any numbers on the parts itself.or measure the parts give us dimension or drawing.

Q3.How about the payment terms for bulldozer parts?
A:We usually accept TfT or LC. other terms also could be negotiated.

Q4.What is your minimum order for excavator undercarriage parts?
A:lt depends on what you are buying.Normally, our minimum order is one 20' full containerand LCL container (less than a container load) can be acceptable.

Q5.What is your delivery time for construction machinery parts?
FOB Xiamen or any Chinese port : 25-30days . lf there are any parts in stock ,our delivery time is only 7-10 days.

Q6. what about Quality Control?
We have excellent tester, check every piece to ensure the quality is good,and strict control to ensure product safety into container.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier